  • Standard Terms of Reference (TOR) for Mining Project

    Standard Terms of Reference (TOR) for Mining Project another in terms of the mine lease area, production levels, waste generation and its management, mining technology etc. and should be in the name of the lessee. contained in the EIA such as waste generation etc. should be for the life of the mine lease period. 12) Land use of the

  • Terms of Reference for the Environmental Impact Assessment

    Terms of Reference, EIA Kvanefjeld Multi-element Project i P a g e TABLE OF CONTENTS 1 INTRODUCTION 1 1.1 The EIA Process 1 1.2 The Project 2 1.3 Scoping workshops 2 1.4 The Terms of Reference (“ToR”) 3 2 SCOPING AND ENVIRONMENTAL STUDY PLAN 4 2.1 Initial Terms of Reference Approved July 2011 4 2.2 Developments since July 2011 4

  • Draft Terms of Reference (TOR) Environmental and Social

    1 Draft Terms of Reference (TOR) Environmental and Social Impact Assessment (ESIA) For the proposed Kosovo Power Project comprising of (i) the development of a Lignite-Fired Power Plant (“Kosova e Re” Power Plant or KRPP) at Obiliq; (ii) rehabilitation of

  • Terms of References (TORs) for EIAs

    Terms of References (TORs) for EIAs Once a project or development has gone through the screening and scoping phases, the authority responsible for processing the EIA provides the client with a Terms of Reference (TOR) document. The TOR provides details of all the information required for the EIA review committee to make an

  • File Size: 727KB
  • REGULATORY FRAMEWORK IN RELATION TO MINING IN

    grounds. With respect to licensing procedures, the Mineral Law and Decree 15 extend the term of the exploration licences from 24 to 48 months, and additionally require the licensees’ debt/equity ratio of 50/50 for exploration and 70/30 for mining projects. The mining right transfer procedures are also set out in a clearer manner.

  • Environmental Impact Assessment Guidelines for the Mining

    May 25, 2018· Scoping for Mining Projects 9 Preparing the Project Description 9 Analysis of Alternatives 9 Identification of Environmental and Social Issues. 10 Community Engagement and Community Development Planning 10 Indicative Terms of Reference for Environmental Impact Assessment 11 Conducting the Environmental Impact Assessment 12

  • EIA Application Attachment 2a AER Terms of Reference

    TABLE 1 AER Final Terms of Reference Environmental Impact Assessment Report for Benga Mining Limited (Benga Mining) Proposed Grassy Mountain Coal Project Cross Reference (Concordance) Table to Location in Application and Submitted Addenda. Updated Oct. 17, 2018

  • Terms of Reference for Conducting an Environmental Impact

    EIA Terms of Reference for Suntrax Corporation Limited Proposed Limestone Mining Project at Rose Hall in Clarendon 4 This document focuses on the quarrying aspect of the project. The cement plant was initially included but is now being considered as a separate application. a) Subsurface Open Cast Mining

  • 3. Reviewing a Typical EIA for a Mining Project

    aspect of the proposed mining project in sufficient detail to enable citizens to understand the project’s true environmental and social impacts. For example, the Project Description in a poor EIA might state: “A wet tailings impoundment shall be constructed for disposal of tailings from the mining project.”

  • FINAL Environmental Impact Assessment and Environmental

    1.5 SCOPE OF EIA STUDY 6 1.6 COMPLIANCE TO THE APPROVED TERMS OF REFERENCE AND COMPLIANCE 7-12 CHAPTER 2- PROJECT DESCRIPTION 13-34 2.1 BACKDROP 13 2.2 TYPE OF PROJECT 13 2.3 NEED FOR THE PROJECT 13 2.4 GENERAL LOCATION AND ACCESSIBILITY 14 2.4.1 Topography, Physiography 14 2.4.2 Location of Eco-sensitive areas from the project site. 14

  • Draft Terms of Reference (TOR) Environmental and Social

    1 Draft Terms of Reference (TOR) Environmental and Social Impact Assessment (ESIA) For the proposed Kosovo Power Project comprising of (i) the development of a Lignite-Fired Power Plant (“Kosova e Re” Power Plant or KRPP) at Obiliq; (ii) rehabilitation of

  • ENVIRONMENTAL IMPACT ASSESSMENT (EIA) PROJECT

    The Environmental Impact Assessment (EIA) identified specific areas of concern that could be affected by implementation of the proposed project in all the three phases; drilling and construction, operation and decommissioning and proposed mitigation measures.

  • TERMS OF REFERENCE [TOR] FOR EIA REPORTTERMS OF

    Terms of Reference (TOR) for preparation of Environmental Impact assessment (EIA) for Ports and Harbour projects as per the EIA notification, 2006 has been devised to improve the quality of the reports and facilitate the decision making transparent and

  • EIA Application Attachment 2a AER Terms of Reference

    TABLE 1 AER Final Terms of Reference Environmental Impact Assessment Report for Benga Mining Limited (Benga Mining) Proposed Grassy Mountain Coal Project Cross Reference (Concordance) Table to Location in Application and Submitted Addenda. Updated Oct. 17, 2018

  • Environmental Impact Assessment process for deep-sea

    Jan 01, 2018· An EIA is one component of the environmental management for a project, and fits in the appraisal phase within the larger framework of management activities .The EIA should be undertaken once an initial assessment of the environment has been made, and planning has progressed sufficiently for the project plan to be well developed, the environmental risks to be assessed and mitigation

  • FINAL TERMS OF REFERENCE

    1.1 The EIA Report The purpose of these Terms of Reference is to identify for the public and Albian Sands Inc (Albian), the information required by federal and provincial government agencies for an Environmental Impact Assessment (EIA) report. Albian will prepare and submit an EIA report to explain the environmental effects of its Expansion

  • EIA analysis of coal mining project by Jindal Steel and

    Jindal Steel and Power Ltd. is planning to set up an 4 million tonnes per annum (TPA) coal mining project in Raigarh district of Chattisgarh. On behalf of the local community, Ekta Parishad, requested us to technically evaluate the Rapid Environment Impact Assessment done for the project. Mining is proposed in the Gare IV/6 mining block, which is part of the Mand-Raigarh coalfields.

  • Environmental and Social Review Procedure Dec 98

    intermediary projects), while a number of guidance notes contain additional information to assist IFC staff and project sponsors (e.g., checklist of potential issues for an EIA, content of an environmental impact assessment for a Category A project). The requirements under this procedure will apply to all

  • Chapter 5: Preparation of terms of reference

    The timing of the study is important. Scoping prior to a full EIA will enable the major issues to be identified. The terms of reference for the full EIA can then be better focused. The study should be carried out early enough in the project cycle to enable recommendations to be incorporated into the project

  • Environmental Impact Assessment of Projects

    the effects of certain public and private Projects on the environment. The EIA process is composed of different steps: preparation of the EIA Report, publicity and consultation and decision-making. EIA Report The Environmental Impact Assessment Report is the document prepared by the Developer that presents the output of the assessment.

  • Technical Review Guidelines for Environmental Impact

    Volume 1 contains the guidelines which track with internationally recognized elements of environmental impact assessment with a glossary and references.; Volume 1, Part 2 contains example Terms of Reference cross-linked to Volumes 1 and 2 for different types of mining, energy, and/or tourism projects respectively for use by the countries as they prepare their own EIA program requirements.

  • TERMS OF REFERENCE FOR ENVIRONMENTAL ASSESSMENT

    EAP TERMS OF REFERENCE OCT 2010 Page 3 of 12 DEFINITIONS “EIA Regulations” refers to the Environmental Impact Assessment Regulations, 2010 of 18 June 2010 and/or any other amendments thereto, as may be promulgated by DEA from time to time. NOTE: 1. These terms of reference have been compiled to facilitate and accomplish the following:

  • ENVIRONMENTAL IMPACT ASSESSMENT

    EIA for Cement Plant & Limestone Quarry, St. Catherine/Clarendon Cement Jamaica Limited, EXECUTIVE SUMMARY Introduction The Environmental Impact Assessment (EIA) has been prepared in accordance with Terms of Reference (TOR) approved by Jamaica’s National Environment and Planning Agency (NEPA) found in Section 4.0 of this report.

  • Examples EIA Online Learning Platform

    EIA Case Studies. See how the EIA process was carried out in the following case studies of real-life EIAs from 2 different countries and sectors: Energy Nicaragua; Mining Colombia; The Social Side of EIA. In most countries the EIA legislation mandates some form of public participation during the EIA process.

  • ENVIRONMENTAL IMPACT ASSESSMENT (EIA) PROJECT

    The Environmental Impact Assessment (EIA) identified specific areas of concern that could be affected by implementation of the proposed project in all the three phases; drilling and construction, operation and decommissioning and proposed mitigation measures.

  • Terms of Reference for Environmental Impact Assessment

    Benga Mining Limited. Terms of Reference for Environmental Impact required by government agencies for an environmental impact assessment (EIA) report prepared under the Environmental Protection and Enhancement Act (EPEA) into the project design, EIA development, impact mitigation, monitoring, and reclamation.

  • Examples EIA Online Learning Platform

    EIA Case Studies. See how the EIA process was carried out in the following case studies of real-life EIAs from 2 different countries and sectors: Energy Nicaragua; Mining Colombia; The Social Side of EIA. In most countries the EIA legislation mandates some form of public participation during the EIA process.

  • FINAL TERMS OF REFERENCE

    1.1 The EIA Report The purpose of these Terms of Reference is to identify for the public and Albian Sands Inc (Albian), the information required by federal and provincial government agencies for an Environmental Impact Assessment (EIA) report. Albian will prepare and submit an EIA report to explain the environmental effects of its Expansion

  • Environmental and Social Review Procedure Dec 98

    intermediary projects), while a number of guidance notes contain additional information to assist IFC staff and project sponsors (e.g., checklist of potential issues for an EIA, content of an environmental impact assessment for a Category A project). The requirements under this procedure will apply to all

  • Environmental Impact Assessment Guidelines for Coastal

    2.2 EIA Reports Terms of Reference 18 2.3 Recommendations for Effective EIA for Coastal Tourism Development 19 2.4 Conclusion: Benefits of EIA for Coastal Tourism Development 26 3 Appendices 27 Appendix 1 Estimated and Projected Economic Impact of Tourism in

  • Environmental Impact Assessment of Projects

    the effects of certain public and private Projects on the environment. The EIA process is composed of different steps: preparation of the EIA Report, publicity and consultation and decision-making. EIA Report The Environmental Impact Assessment Report is the document prepared by the Developer that presents the output of the assessment.

  • ENVIRONMENTAL IMPACT ASSESSMENT REPORT ON

    Construction Projects An Environmental Impact Assessment (EIA) Report shall be prepared by an entity qualified for conducting the work of environmental impact assessment. 1. Project Name shall refer to the name applied by the project at the time when it

  • Guidance Document on Biodiversity, Impact Assessment and

    The Terms of Reference for many impact assessments and specialist studies are often poorly Cumulative effects are seldom addressed at project-level EIA and therefore developments The International Council on Mining and Metals has produced “Good practice guidance for mining and biodiversity” (May 2005).

  • Environmental impact statement process Environment, land

    EPBC Act Bilateral Agreement. Information about the bilateral agreement between the Commonwealth of Australia and the State of Queensland relating to environmental assessment.

  • Recent Environmental Impact Assessment Review Articles

    CiteScore: 7.3 ℹ CiteScore: 2019: 7.3 CiteScore measures the average citations received per peer-reviewed document published in this title. CiteScore values are based on citation counts in a range of four years (e.g. 2016-2019) to peer-reviewed documents (articles, reviews, conference papers, data papers and book chapters) published in the same four calendar years, divided by the number of

  • Terms of reference Department of State Development

    To enable a proponent to do this, the Coordinator-General prepares terms of reference (TOR) that set out the matters the project proponent must address when preparing the EIS. For examples of finalised TORs for coordinated projects, refer to projects on the current projects page.

  • 11 Environment Management Plan (EMP) 11-2

    The Project Manager is responsible for overall management of the project and EMP implementation. The following tasks will fall within his/her responsibilities: Be aware of the findings and conclusions of the Environmental Impact Assessment and the conditions stated within the EIA License issued by NEMA;

  • Environmental Impact Assessments in Developing Countries

    The Environmental Impact Assessment (EIA) process, which originated in the United States in the late 1960s and early 1970s, has been adopted extensively in the rest of the world. The U.S. model and that of other developed countries share basic principles and reflects commonly agreed-upon approaches to similar problems.